Client A

Project Objective

Provision of integrated production chemical solutions for the oil field including supply and application of demulsifiers, sludge breakers, and pour points depressants (PPD’S) to ensure export of on-spec crude oil at all times.

All emulsion, heavy sludge, and flow assurance challenges were resolved, and the crude production process effectively improved, resulting in increased production volume of exportable crude oil and increased revenue per day. Client A expressed overwhelming gratitude to Pearl for helping to solve a long-standing emulsion and flow assurance problem. They are now barging produced crude products to Focardos Export Terminal, which they could not do before due to unexportable crude oil products.

Challenge

A long-lasting emulsion/heavy sludge and flow-assurance problem which frustrated the production process, hindered the production of exportable crude oil, and ultimately reduced revenue generation.

Solutions Implemented

PEARL’s team of engineers and chemists deployed professional oilfield production chemical treatment best technologies and formulated site-specific demulsifier, sludge-breaker and wax inhibitor (PPD) chemistries for the client through a rigorous R&D exercise.

Results

All emulsion, heavy sludge, and flow Assurance challenges were resolved, and the crude production process effectively improved resulting in increased production volume of exportable crude oil and increased revenue per day. CLIENT A expressed overwhelming gratitude to PEARL for helping to crack a long-standing emulsion and flow assurance problem. They are now barging produced crude products to Focardos Export Terminal, an aspect they could not do before due to unexportable crude oil products.

Recent Case Studies

  1. Client A
    Provision of integrated production chemical...
    Read More
  2. Client B
    All emulsion issues were effectively...
    Read More
  3. Client C
    Provision of integrated production chemical...
    Read More